Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
Päätekijät: | Murtaza, Mohammad G., M. Ghulam Sattar |
---|---|
Aineistotyyppi: | Research report |
Kieli: | English |
Julkaistu: |
BRAC Research and Evaluation Division (RED)
2019
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/13356 |
Samankaltaisia teoksia
-
Exploring Hazard Risks and People’s Adjustment: A Study in the Downstream of the Padma Multipurpose Bridge Project
Tekijä: Khan, Md Fahim Azraf
Julkaistu: (2022) -
Report of the baseline survey of potential erosion and flood affected areas of Jamuna Multipurpose Bridge Project
Tekijä: Chowdhury, Pijush Kanti, et al.
Julkaistu: (2019) -
নিজস্ব অর্থায়নে পদ্মা সেতু নির্মানের বাস্তবায়নযোগ্যতা নিয়ে সংশয়
Tekijä: দৈনিক প্রথম আলো
Julkaistu: (2012) -
Revisiting Jamuna bridge resettlement areas: exploring livelihood status of the affected people
Tekijä: Ghosh, Shyamal C, et al.
Julkaistu: (2019) -
Bridge and structure estimating /
Tekijä: Nardon, J. David
Julkaistu: (1996)