Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
Autores principales: | Murtaza, Mohammad G., M. Ghulam Sattar |
---|---|
Formato: | Research report |
Lenguaje: | English |
Publicado: |
BRAC Research and Evaluation Division (RED)
2019
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/13356 |
Ejemplares similares
-
Exploring Hazard Risks and People’s Adjustment: A Study in the Downstream of the Padma Multipurpose Bridge Project
por: Khan, Md Fahim Azraf
Publicado: (2022) -
Report of the baseline survey of potential erosion and flood affected areas of Jamuna Multipurpose Bridge Project
por: Chowdhury, Pijush Kanti, et al.
Publicado: (2019) -
নিজস্ব অর্থায়নে পদ্মা সেতু নির্মানের বাস্তবায়নযোগ্যতা নিয়ে সংশয়
por: দৈনিক প্রথম আলো
Publicado: (2012) -
Revisiting Jamuna bridge resettlement areas: exploring livelihood status of the affected people
por: Ghosh, Shyamal C, et al.
Publicado: (2019) -
Bridge and structure estimating /
por: Nardon, J. David
Publicado: (1996)