Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
প্রধান লেখক: | Murtaza, Mohammad G., M. Ghulam Sattar |
---|---|
বিন্যাস: | Research report |
ভাষা: | English |
প্রকাশিত: |
BRAC Research and Evaluation Division (RED)
2019
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/13356 |
অনুরূপ উপাদানগুলি
-
Exploring Hazard Risks and People’s Adjustment: A Study in the Downstream of the Padma Multipurpose Bridge Project
অনুযায়ী: Khan, Md Fahim Azraf
প্রকাশিত: (2022) -
Report of the baseline survey of potential erosion and flood affected areas of Jamuna Multipurpose Bridge Project
অনুযায়ী: Chowdhury, Pijush Kanti, অন্যান্য
প্রকাশিত: (2019) -
নিজস্ব অর্থায়নে পদ্মা সেতু নির্মানের বাস্তবায়নযোগ্যতা নিয়ে সংশয়
অনুযায়ী: দৈনিক প্রথম আলো
প্রকাশিত: (2012) -
Revisiting Jamuna bridge resettlement areas: exploring livelihood status of the affected people
অনুযায়ী: Ghosh, Shyamal C, অন্যান্য
প্রকাশিত: (2019) -
Bridge and structure estimating /
অনুযায়ী: Nardon, J. David
প্রকাশিত: (1996)