Combating a deadly menace: early experiences with a community-based arsenic mitigation project in Bangladesh
Bangladesh is facing the problem of arsenic poisoning in drinking water. Around 27% of the tubewells, which supply drinking water to most of the population, have arsenic concentrations above the government of Bangladesh limit of 50 t.g per litre. This means that a quarter of the • country's...
Príomhchruthaitheoirí: | , , , , , |
---|---|
Formáid: | Research report |
Teanga: | English |
Foilsithe / Cruthaithe: |
BRAC Research and Evaluation Division (RED)
2019
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/13319 |