Socio-economic performance of BRAC DTW program
BRAC launched its irrigation program in early 1980s with low lift pump and then introduced the DTW program in 1984-85. Since 1990-91 BRAC has gone through a large-scale expansion of the program. In the last 1994-95 boro season 632 DTWs were operated in 89 RDP areas. The majority of these were not pr...
Main Authors: | , , |
---|---|
Formato: | Research report |
Idioma: | en_US |
Publicado: |
BRAC Research and Evaluation Division (RED)
2019
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/13050 |