Main Findings reports of the RDP impact assessment study
Introduction The 1993-94 Impact Assessment Study (lAS) of the Rural Development Programme (RDP) has been carried out by BRAC's Research and Evaluation Division, with consultancy assistance from the Centre for Development Studies, Swansea. RDP's Impact on the Material Well-Being of...
Główni autorzy: | Mustafa, Shams, Ara, lshrat, Moshin, M., Banu, Dilruba, Kabir, Azmal |
---|---|
Kolejni autorzy: | Rural development projects--Bangladesh. |
Format: | Research report |
Język: | English |
Wydane: |
BRAC
2019
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/12942 |
Podobne zapisy
-
Main findings report of the RDP impact assessment study /
od: Mustafa, Mr. Shams
Wydane: (1995) -
VuFind project final report
od: Afroz, Hasina, i wsp.
Wydane: (2011) -
Main findings report of the RDP impact assessment study: February 1995
od: Mustafa, Shams, i wsp.
Wydane: (2016) -
An assessment of the biweekly collection system of RDP
od: Banu, Dilruba
Wydane: (2019) -
Findings and observation on submitted designs and documents of BRAC University new campus project
od: Brac University
Wydane: (2023)