Main Findings reports of the RDP impact assessment study
Introduction The 1993-94 Impact Assessment Study (lAS) of the Rural Development Programme (RDP) has been carried out by BRAC's Research and Evaluation Division, with consultancy assistance from the Centre for Development Studies, Swansea. RDP's Impact on the Material Well-Being of...
Autors principals: | Mustafa, Shams, Ara, lshrat, Moshin, M., Banu, Dilruba, Kabir, Azmal |
---|---|
Altres autors: | Rural development projects--Bangladesh. |
Format: | Research report |
Idioma: | English |
Publicat: |
BRAC
2019
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/12942 |
Ítems similars
-
Main findings report of the RDP impact assessment study /
per: Mustafa, Mr. Shams
Publicat: (1995) -
VuFind project final report
per: Afroz, Hasina, et al.
Publicat: (2011) -
Main findings report of the RDP impact assessment study: February 1995
per: Mustafa, Shams, et al.
Publicat: (2016) -
An assessment of the biweekly collection system of RDP
per: Banu, Dilruba
Publicat: (2019) -
Findings and observation on submitted designs and documents of BRAC University new campus project
per: Brac University
Publicat: (2023)