Planning and project appraisal: a brief on the Deep Tube Well (DTW) irrigation programme of BRAC
Main Authors: | Mustafa, Shams, Rahman, Sanzidur |
---|---|
其他作者: | Irrigation--Bangladesh. |
格式: | Research report |
語言: | English |
出版: |
BRAC
2019
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/12899 |
相似書籍
-
Installation of 2nd deep tube-well works
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Deep tube Well & WASA piping layout drawing
由: Electro-Mechanical Control Services (EMCS)
出版: (2023) -
Tube well coordinate confirmation, notice of tube well construction
由: BUCG-ABC Joint Venture
出版: (2023) -
Installation of 2nd deep tube-well at BRACU new campus project
由: Brac University
出版: (2023) -
Response in installation of deep tube well works of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)