Planning and project appraisal: a brief on the Deep Tube Well (DTW) irrigation programme of BRAC
Hlavní autoři: | Mustafa, Shams, Rahman, Sanzidur |
---|---|
Další autoři: | Irrigation--Bangladesh. |
Médium: | Research report |
Jazyk: | English |
Vydáno: |
BRAC
2019
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/12899 |
Podobné jednotky
-
Installation of 2nd deep tube-well works
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Deep tube Well & WASA piping layout drawing
Autor: Electro-Mechanical Control Services (EMCS)
Vydáno: (2023) -
Tube well coordinate confirmation, notice of tube well construction
Autor: BUCG-ABC Joint Venture
Vydáno: (2023) -
Installation of 2nd deep tube-well at BRACU new campus project
Autor: Brac University
Vydáno: (2023) -
Response in installation of deep tube well works of BRAC University new campus project
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)