STP & water tank section=6-6 of BRAC University new campus project
This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.
| Päätekijä: | Electro-Mechanical Control Services (EMCS) |
|---|---|
| Aineistotyyppi: | Drawings |
| Kieli: | English |
| Julkaistu: |
Brac University
2023
|
| Aiheet: | |
| Linkit: | http://hdl.handle.net/10361/21439 |
Samankaltaisia teoksia
-
STP & water tank section=5-5 of BRAC University new campus project
Tekijä: Electro-Mechanical Control Services (EMCS)
Julkaistu: (2023) -
STP & water tank section=4-4 of BRAC University new campus project
Tekijä: Electro-Mechanical Control Services (EMCS)
Julkaistu: (2023) -
STP & water tank layout for basement 3 (utility building)
Tekijä: Electro-Mechanical Control Services (EMCS)
Julkaistu: (2023) -
STP section=2-2 of BRAC University new campus project
Tekijä: Electro-Mechanical Control Services (EMCS)
Julkaistu: (2023) -
STP section=1-1 of BRAC University new campus project
Tekijä: Electro-Mechanical Control Services (EMCS)
Julkaistu: (2023)